Return to Home Page
 Test Language

» Example 1
» Example 2
» Example 3
» Example 4
» Example 5
» Example 6
» Example 7
» Example 8
» Example 9

 Additional Links

» Home Page

» Eurocard Range
» Communication Boxes
» Engine Module Testers
» OBD Vehicle Diagnostics

PLANT LINK S.L. TEST PROGRAMMING LANGUAGE EXAMPLE 5


Pins 20 and 39 of the module under test have a physical connection to load resistors. This instruction connects the other terminal of these load resistors to one of three possible states: A power supply (VPWR), ground (GND), or open circuit. Comments are in green.

Set_Loads(J1-20:VPWR;J1-39:GND)

/ Connect J1-20 load to VPWR & J1-39 load to GND

The Set_Loads function connects the loads specified in the parameters (J1-20:VPWR, J1-39:GND). In this case the load on pin J1-20 of the module is connected to the VPWR line and the load on pin J1-39 is connected to the GND line.



HOME | CONTACT US

© Plant Link S.L.